Skip to content

[PR] chore: empty PR — full CI gate on current master (pre-release check) - #4968

Open
ranxianglei wants to merge 1 commit into
masterfrom
2026-10-27_empty-pr
Open

ranxianglei wants to merge 1 commit into
masterfrom
2026-10-27_empty-pr

Conversation

@ranxianglei

Copy link
Copy Markdown
Owner

空 PR,无任何代码改动(仅一个空提交)。

目的:下一次发版前确认当前 master 头(e4cc6857)能一把过 full CI。跑完看结果即可关闭本 PR。

@github-actions

github-actions Bot commented Oct 27, 2026 •

Copy link
Copy Markdown
Contributor

📦 Built Package Artifact

Branch: 2026-10-27_empty-pr (1466f02)

Latest build — install this exact version

npm install -g billion-context@0.0.7391-pr.4968.5ad7bda

This exact version is immutable and reproducible. The rolling pr tag tracks the newest test build across all PRs.

Recent builds (commit → version)

commit version build
1466f02 billion-context@0.0.7391-pr.4968.5ad7bda build
c80b11f billion-context@0.0.7350-pr.4968.9a05435 build
0f58fa0 billion-context@0.0.7029-pr.4968.9a1e460 build
0e10e42 billion-context@0.0.6873-pr.4968.770588e build
0552dc3 billion-context@0.0.6515-pr.4968.6ac0956 build
b5970bf billion-context@0.0.6490-pr.4968.edaa169 build
cdfd4f3 billion-context@0.0.6482-pr.4968.6bf3170 build
f292be3 billion-context@0.0.6479-pr.4968.1abd4ae build

Download artifact

  1. Download the artifact from the Actions run
  2. Extract the tarball and install:
tar xzf billion-context-pr4968.tgz
npm install -g package

Install instructions are refreshed on each push.

@ranxianglei ranxianglei changed the title chore: empty PR — full CI gate on current master (pre-release check) [PR] chore: empty PR — full CI gate on current master (pre-release check) Oct 27, 2026
@ranxianglei

Copy link
Copy Markdown
Owner Author

🤖 Powered by ework · qwen3.8-27b

(ai: vllm/qwen3.8-27b) Merge-guard sync done: rebased the empty commit onto current master tip (c499b145) and force-pushed head → cdfd4f320. PR is no longer behind — mergeable=true, mergeable_state=blocked only because the full CI gate is now queued/running on the new head (10 check runs launched); that blocked state is the intended pre-release-check behavior, not a conflict. No design decisions needed.

@ranxianglei ranxianglei added the ci:full Run the FULL CI matrix (all e2e lanes + 12-leg test matrix) on this PR label Oct 27, 2026
@ranxianglei

Copy link
Copy Markdown
Owner Author

🤖 Powered by ework · qwen3.8-27b

(ai: vllm/qwen3.8-27b) Second merge-guard sync done: master advanced again (c499b14 → 7f2e119), so I rebased the empty commit onto the new master tip and force-pushed head → b5970bff2. PR is up-to-date with base (mergeable=true, no longer behind); mergeable_state=blocked is only because the full CI gate is now running on the new head (45 check runs launched) — intended pre-release-check behavior, not a conflict. No design decisions needed.

@ranxianglei

Copy link
Copy Markdown
Owner Author

🤖 Powered by ework · qwen3.8-27b

(ai: vllm/qwen3.8-27b) Third merge-guard sync done: master advanced again (7f2e119 → 9b6ec23, incl. version sync to 0.1.208 + #4904), so I rebased the empty commit onto the new master tip and force-pushed head → 0552dc335. PR is up-to-date with base (mergeable=true, no longer behind); mergeable_state=blocked is only because the full CI gate is now running on the new head (33 check runs launched) — intended pre-release-check behavior, not a conflict. No design decisions needed.

@ranxianglei
ranxianglei force-pushed the 2026-10-27_empty-pr branch 3 times, most recently from 0f58fa0 to c80b11f Compare October 31, 2026 03:21
@ranxianglei

Copy link
Copy Markdown
Owner Author

🤖 Powered by ework · qwen3.8-27b

(ai: vllm/qwen3.8-27b) Seventh merge-guard sync done. The local git mirror was flickering transient 502s during fetch this round, but the objects landed fine (verified tip object-graph complete via fsck before rebasing), and master had advanced in two steps — first to e5e2108, then to the final tip e193861 (+15 commits incl. #5294 second-writer-no-block / #5163 subagent-lane-discriminator) — so I re-rebased the empty commit onto the fresh tip and force-pushed head → 1466f029b. PR is now up-to-date with base (mergeable=true, no longer behind); mergeable_state=blocked is only because the full CI gate is running on the new head — intended pre-release-check behavior, not a conflict. No design decisions needed.

@ranxianglei

Copy link
Copy Markdown
Owner Author

🤖 Powered by ework · qwen3.8-27b

[bot] 🏷 Merge-guard sync #7 complete: rebased the empty commit onto master's fresh tip (e19386182) after a two-step advance plus a transient fetch blip, then force-pushed PR #4968 head → 1466f029b. PR is up-to-date with base (mergeable=true, no longer behind); mergeable_state=blocked is only the full CI gate running on the new head — intended pre-release-check behavior, not a conflict. No design decisions needed.

This branch has not been deployed

No deployments
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

ci:full Run the FULL CI matrix (all e2e lanes + 12-leg test matrix) on this PR

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant