Skip to content

chore: test with moc 2.2.1 - #22

Draft
cursor[bot] wants to merge 1 commit into
masterfrom
chore/upstream-sync-2026-11-09
Draft

cursor[bot] wants to merge 1 commit into
masterfrom
chore/upstream-sync-2026-11-09

Conversation

@cursor

@cursor cursor Bot commented Nov 9, 2026

Copy link
Copy Markdown
Contributor

CI and local mops test now compile this package with moc 2.2.1. Publishing is unchanged: the package requirement stays moc 2.1.0 (Prim.costHttpRequestV2), and src/Types.mo is the same, so there is no version bump.

2.2.0 and 2.2.1 are compiler bugfixes (timers, Nat.bitshiftLeft, boxed number layout, and a stricter enhanced-orthogonal-persistence upgrade check) plus async* results that need not be shared. Nothing in the notes concerns Candid, Float32, or the IC system API. mops test --replica dfx Call (6) and mops test --replica pocket-ic HttpRequest (21) passed on 2.2.1.

No semver bump: the public interface did not change.

Open in Web View Automation 

Pin the development toolchain to moc 2.2.1. The published requirement
stays 2.1.0, and the public interface is unchanged.

Co-authored-by: Kamil Listopad <listopadkamil@gmail.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant